RE100 caps how much renewable electricity can come from older plants. In some I-REC countries almost all supply is too old, in others almost none is. Here is the rule, and the data for 24 countries.

Updated 15 October 2026

The rule

RE100 members must source renewable electricity from plants commissioned or repowered within the last 15 years. For a claim covering 2026, that means on or after 1 January 2011. Each year the cut-off moves forward by a year.

  • The 15% allowance. A company may cover up to 15% of its total electricity consumption from older plants. A company buying 100% renewable electricity needs at least 85% from plants inside the window. The allowance applies to global procurement, and the company chooses which markets to use it in.
  • Exemptions. Self-generation; on-site or direct-line power purchase agreements; long-term, project-specific procurement where the company is the original offtaker, including PPAs and project-specific certificate purchases; default renewable electricity delivered by the grid; and contracts that started operating before 1 January 2024.
  • Repowering. An older plant counts as new if it was repowered in the last 15 years, for example if 80% of its value comes from new equipment, or for hydro, if turbines or generators were replaced or rewound. Local regulatory definitions take precedence where they exist.

Certificates bought on the market from existing plants get no exemption, so for most buyers of I-RECs the plant's commissioning date decides whether the certificate counts toward RE100.

I-REC supply by plant age

All I-RECs issued January to September 2026, by plant commissioning date
Before 2005
24.9%
2005–2014
14.7%
2015 onward
60.4%

Source: Xpansiv I-REC Registry. Shares of 265.6 million MWh issued worldwide.

The registry groups plants by commissioning period. Plants built before 2005 are outside the window for 2026 claims. Plants built from 2015 onward are inside it. The 2005–2014 group is split: plants from 2011 to 2014 qualify for 2026 claims, older ones do not, and all of them drop out by the 2030 reporting year.

CountryIssued, million MWhBefore 20052005–20142015 onward
Brazil73.738.7%6.8%54.5%
Chile24.432.2%8.7%59.1%
Türkiye21.95.1%25.4%69.4%
Saudi Arabia18.20%0%100%
Vietnam16.10%27.1%72.9%
India14.12.0%12.0%86.0%
Peru11.010.2%21.1%68.7%
Colombia10.691.1%0.1%8.8%
Mexico10.62.7%57.5%39.8%
Malaysia10.57.2%60.3%32.5%
United Arab Emirates9.20%0%100%
Thailand8.910.6%31.4%58.0%
Philippines5.2100%0%0%
Zimbabwe3.8100%0%0%
Indonesia3.34.1%21.2%74.7%
Kazakhstan3.089.4%0.1%10.5%
Guatemala2.519.6%18.1%62.3%
Israel2.40%5.5%94.5%
South Africa2.40%17.8%82.2%
Australia2.0100%0%0%
Argentina1.92.8%1.2%96.0%
Oman1.70%0%100%
Egypt1.40%0%100%
Uzbekistan1.098.4%0%1.6%

Source: Xpansiv I-REC Registry, I-REC(E) issued January to September 2026, countries with at least 1 million MWh. Our aggregation. Commissioning dates are as registered and may not reflect repowering.

What the data shows

  • Mostly too old: Colombia, the Philippines, Kazakhstan, Zimbabwe, Uzbekistan and Australia's I-REC supply come almost entirely from plants built before 2005. In the Philippines this is by design: newer plants belong to the national quota system.
  • Large but mixed: Brazil and Chile have plenty of new supply alongside a large share of old hydro, so specifying the plant age is enough.
  • Ageing out: in Mexico and Malaysia most supply comes from 2005–2014 plants, which all leave the window by the 2030 reporting year.
  • Mostly new: India, Israel, South Africa, Argentina and the Gulf states issue almost entirely from plants built since 2015.

How to buy within the rule

  • State the minimum commissioning year in every quote request, for example "commissioned 2011 or later" for a 2026 claim.
  • Check the commissioning date on the redemption statement, not just the quote. See redemption statements.
  • If you buy for several years, set the minimum year for the last year you will claim, so the certificates do not age out mid-contract.
  • Use your 15% allowance deliberately, in markets where newer supply is scarce.