| Certificate | I-REC(E), the instrument in common use according to RE100 |
| Local issuer | Instituto Totum |
| Registry | Evident (Xpansiv) |
| First issuance | December 2016 |
| Issued in 2025 | 64.7 million MWh, about 22% of all I-RECs issued worldwide and the most of any country |
| Issued January to September 2026 | 73.7 million MWh |
| Market boundary | Brazil. Certificates must come from Brazilian plants |
| Grid | 86.8% renewable in 2025, about half of it hydro |
What counts in Brazil
I-RECs are the standard instrument. RE100 lists I-REC as the certificate system in common use in Brazil, which means its members must cancel certificates to claim renewable electricity bought from the grid. Almost all Brazilian I-RECs are used at home: 99.6% of those redeemed since June 2025 named a beneficiary in Brazil.
Companies reporting under the Brazilian GHG Protocol Program can use certificates, or a free-market electricity contract, for market-based Scope 2. The program applies the national grid emission factor to electricity not covered by either.
REC Brazil is a label, not a separate certificate
REC Brazil is an extra seal applied to I-RECs that are already issued. It was created by the wind and small-hydro industry associations. It adds criteria: a plant age limit of 15 years for solar, wind and biomass and 25 years for small hydro, no large hydro above 30 MW, and no separate sale of attributes such as carbon credits. Most reporting frameworks do not require it.
Supply
- Hydro
- 50.0%
- Wind
- 37.8%
- Solar
- 10.7%
- Bioenergy
- 1.4%
Source: Xpansiv I-REC Registry. Shares of 73.7 million MWh issued.
- 2020
- 4.0
- 2021
- 9.2
- 2022
- 21.9
- 2023
- 37.8
- 2024
- 50.9
- 2025
- 64.7
- 2026, Jan to Sep
- 73.7
Source: Xpansiv I-REC Registry, by date of issue. 2026 covers nine months only.
Redemptions follow the reporting calendar. In 2026 they peaked in March, at 22.9 million MWh, as companies closed their 2025 inventories.
The plant-age catch
RE100 requires at least 85% of a member's renewable electricity to come from plants commissioned or repowered in the last 15 years. For a 2026 claim, that means plants commissioned on or after 1 January 2011. Older plants can cover at most 15% of total consumption, apart from exemptions for long-term contracts.
- Before 1990
- 24.4%
- 1990–2004
- 14.4%
- 2005–2014
- 6.8%
- 2015–2019
- 22.6%
- 2020–2024
- 29.8%
- 2025 onward
- 2.1%
Source: Xpansiv I-REC Registry. Plants commissioned before 2005, almost all large hydro, fall outside the RE100 window.
At least 39% of current Brazilian supply comes from plants commissioned before 2005. If your claim must meet RE100, specify the commissioning year when you ask for a quote. Reporting frameworks without an age rule may accept the older supply.
Regulation to watch
- Free market for high-voltage users. Since January 2024, all Group A (high-voltage) consumers can choose their electricity supplier. Those under 500 kW buy through a retail agent.
- Free market for low-voltage users. Law 15.269 of November 2025 extends the choice to low-voltage consumers: within 24 months for industrial and commercial users and 36 months for everyone else. More companies will be able to buy renewable supply contracts directly.
- New demand from biofuels. Since August 2026, the fuel regulator ANP accepts I-RECs as evidence of renewable electricity use under its RenovaBio programme.
Before you buy
- Ask for the plant, technology and commissioning date, not just "Brazilian I-RECs".
- Match the vintage to your reporting year.
- Make sure the redemption names your Brazilian legal entity, the consumption period and the site or country of consumption. See redemption statements.