REC.marketGet notified

Markets · Uzbekistan

Uzbekistan

Uzbekistan's national green energy certificate is the I-REC: a 2023 presidential resolution made the Ministry of Economy and Finance the issuer. Almost all certificates come from hydro plants built in the 1970s, which RE100's 15-year rule largely excludes.

Updated 17 October 2026

CertificateGreen energy certificate, issued as an I-REC(E). Not yet listed by RE100
IssuerMinistry of Economy and Finance, accredited June 2023. First issue February 2024
I-RECs issued0.45 million MWh in 2025, and 1.02 million MWh from January to September 2026
I-RECs redeemed for users in Uzbekistan0.34 million MWh in 2025, and 0.07 million MWh from January to September 2026
Where to buyThe green energy section of the Uzbek commodity exchange, open to foreign companies
Market boundaryUzbekistan. Certificates must come from Uzbek plants
Grid19% renewable in 2025, according to Ember: solar 7.5%, hydro 7.3%, wind 4.6%. Gas makes up 72%

One system, set up by law

Presidential Resolution PP-156 of May 2023 created a green energy certificate system and made the Ministry of Economy and Finance its issuer, with instructions to join the I-REC system. A Cabinet regulation defines the national certificate platform as built on I-REC standards and run with Evident, the registry operator. So in Uzbekistan the national certificate and the I-REC are the same record. One certificate covers 1,000 kWh, can be sold with or without the electricity, and does not expire.

The rules guard against double counting: each MWh can be certified once, a plant registered in another certificate system is refused, and power a company generates and uses itself gets no certificates. They do not mention carbon credits.

Supply

The registry lists five Uzbek plants, all hydro, with 970 MW of capacity. Four, totalling 962 MW, belong to the state hydro company Uzbekhydroenergo: Charvak (666 MW), Khodzhikent (165 MW), Gazalkent (120 MW) and Tuyabuguz (11.4 MW). No solar or wind farm issues certificates yet, although about 3.5 GW of them operate under contracts with the state.

Uzbek I-REC issuance by year, million MWh
2024
0.02
2025
0.45
2026, Jan to Sep
1.02

Source: Xpansiv I-REC Registry, by date of issue. 2026 covers nine months only.

The ministry reports a single 2026 sale of 800,000 certificates to the state oil and gas company, Uzbekneftegaz. Only 0.07 million MWh had been redeemed for Uzbek users by September 2026, so most of that volume was still held.

Plant age and RE100

In 2026, 98.4% of Uzbek issuance came from plants built between 1976 and 1981. RE100 requires plants commissioned or re-powered within 15 years, on or after 1 January 2011 for a 2026 claim, so these certificates count only within the 15% of consumption RE100 allows from older plants, unless an exemption applies. Only Tuyabuguz (2019) and a 7.4 MW plant from 2023 pass, 1.6% of supply. See the 15-year rule.

RE100 has not yet listed Uzbekistan as a market with certificates, since its list uses 2023 CDP data. It suggests checking where I-RECs are issued for a more current picture, and recommends using them. Uzbekistan is its own market: the 3.5% of Uzbek certificates redeemed for users in Turkmenistan do not support claims there. Seeimported certificates.

How to buy

By regulation, certificates are sold in the green energy section of the Uzbek Republican Commodity Exchange, in lots of 1,000 kWh. Local companies, sole traders and foreign companies may take part, and a participant can redeem in its own name or a client's. Since 2025, certificates can also be issued for power delivered directly to an end user. Companies that have used them include banks, carmaker UzAuto Motors, Knauf and British American Tobacco Uzbekistan.

Buying electricity directly

There is no green tariff and no corporate power purchase agreement over the grid. The 2024 electricity law says large consumers must buy on a competitive wholesale market, which is still being set up; until then the state central buyer, Uzenergosotish, buys and sells the power. Renewable producers may sell to companies through a local network or as a block station on the consumer's site. Rooftop and on-site solar counts as self-generation for RE100, but gets no certificates under Uzbek rules.

One ministry has several roles: it issues certificates, is the sole shareholder of the central buyer, and is reported to oversee carbon-credit authorisations. Who holds the attributes of solar and wind plants under state contracts is not stated in any source we found.

Before you buy

  • If you report to RE100, ask for certificates from plants commissioned since 2011. They are scarce.
  • Make sure the redemption names your Uzbek legal entity and gives Uzbekistan as the location of consumption. See redemption statements.
  • If you export to the EU, do not assume certificates reduce emissions under the EU carbon border mechanism. Check the CBAM rules separately.

Latest public price

  • 13,600 UZS per certificate Uzbekistan, green energy certificates (I-RECs), commodity exchange. Reported average, 2024, the exchange quotation for the year.

All prices, with sources and labels · Price history

I-RECs issued and redeemed per quarter, to Q3 2026
  • Issued from plants here
  • Redeemed for users here
00.20.40.60.81202420252026Issued from plants here, Q4 2023: 0.00 million MWhIssued from plants here, Q1 2024: 0.00 million MWhIssued from plants here, Q2 2024: 0.02 million MWhIssued from plants here, Q3 2024: 0.00 million MWhIssued from plants here, Q4 2024: 0.00 million MWhIssued from plants here, Q1 2025: 0.06 million MWhIssued from plants here, Q2 2025: 0.01 million MWhIssued from plants here, Q3 2025: 0.28 million MWhIssued from plants here, Q4 2025: 0.10 million MWhIssued from plants here, Q1 2026: 0.02 million MWhIssued from plants here, Q2 2026: 0.00 million MWhIssued from plants here, Q3 2026: 1.00 million MWhRedeemed for users here, Q4 2023: 0.00 million MWhRedeemed for users here, Q1 2024: 0.00 million MWhRedeemed for users here, Q2 2024: 0.02 million MWhRedeemed for users here, Q3 2024: 0.00 million MWhRedeemed for users here, Q4 2024: 0.00 million MWhRedeemed for users here, Q1 2025: 0.07 million MWhRedeemed for users here, Q2 2025: 0.01 million MWhRedeemed for users here, Q3 2025: 0.27 million MWhRedeemed for users here, Q4 2025: 0.00 million MWhRedeemed for users here, Q1 2026: 0.00 million MWhRedeemed for users here, Q2 2026: 0.02 million MWhRedeemed for users here, Q3 2026: 0.05 million MWh

million MWh

Source: Xpansiv I-REC Registry, I-REC(E) only, our quarterly totals. Issued counts plants in this country; redeemed counts certificates claimed for users here, wherever the plant is.

Show data
PeriodIssued from plants hereRedeemed for users here
Q4 20230.000.00
Q1 20240.000.00
Q2 20240.020.02
Q3 20240.000.00
Q4 20240.000.00
Q1 20250.060.07
Q2 20250.010.01
Q3 20250.280.27
Q4 20250.100.00
Q1 20260.020.00
Q2 20260.000.02
Q3 20261.000.05

Download quarterly volumes for all 43 countries (CSV)

Sources

  1. Xpansiv I-REC Registry: aggregated monthly statistics, data to September 2026 (XLSX, via I-TRACK Foundation)
  2. I-TRACK Foundation: Uzbekistan country page
  3. I-TRACK Foundation: Ministry of Economy and Finance becomes the local issuer (13 June 2023)
  4. Presidential Resolution PP-156 on the green energy certificate system (12 May 2023, lex.uz)
  5. Law ZRU-539 on the use of renewable energy sources, current version (lex.uz)
  6. Decree UP-166 on the next stage of energy sector reform (28 September 2023, lex.uz)
  7. Law ZRU-939 on the electric power industry (7 August 2024, lex.uz)
  8. Ministry of Economy and Finance: green certificates roundtable (30 July 2025)
  9. UzDaily: first 2,000 green energy certificates issued (13 February 2024)
  10. UzDaily: Uzbekistan issues more than 1 million I-REC(E) certificates (3 October 2026)
  11. Anhor.uz: green certificates start trading on the exchange (16 February 2024)
  12. President of Uzbekistan: speech at Abu Dhabi Sustainability Week (14 January 2025)
  13. RE100 technical criteria and appendices (March 2025)
  14. Ember: yearly electricity data (full release, CSV)