REC.marketGet notified

Guide

Imported certificates: when foreign I-RECs do not count.

Certificates have to come from the market where the electricity is used. Most companies get this right, but in some countries most I-RECs redeemed for local companies were issued abroad. Here is the rule, and where it goes wrong.

Updated 16 October 2026

The rule

The GHG Protocol's Scope 2 Guidance requires certificates used in market-based reporting to come from the same market as the operations that use the electricity. It says these markets are usually set by political or regulatory boundaries, not just by physical grid connections.

RE100 is explicit. Its technical criteria say claims must be based on generation in the same market as the use, and that, apart from two single markets, each country is its own market:

  • North America: the United States and Canada. The certificates there are US RECs, not I-RECs.
  • Europe: 23 countries that exchange Guarantees of Origin. See how to buy Guarantees of Origin.

Everywhere else, a certificate for a site in Japan must come from a plant in Japan, one for Singapore from Singapore, and so on. RE100's FAQ adds that a company that cannot find enough local supply may not use a "second best" approach of buying certificates from another market to make up the shortfall.

Most redemptions are local

Across the I-REC registry, 276.7 million MWh were redeemed between June 2025 and September 2026. Of these, 11.2 million MWh, or 4%, were redeemed for a beneficiary in a different country from the plant. The problem is concentrated in a few countries.

Where certificates are imported

Beneficiary countryMillion MWhImportedIssued in
Singapore5.0093.8%Vietnam 72%, Malaysia 14%, Thailand 4%
Mexico14.0012.2%Guatemala 11%, Brazil 1%
Malaysia13.845.5%Vietnam 5%
United States0.52100%Vietnam 71%, India 11%, UAE 10%
Japan0.4187.0%India 85%, Vietnam 1%
Philippines4.845.6%Vietnam 5%
South Korea0.26100%Vietnam 56%, China 31%, India 12%
Guatemala0.9716.7%Honduras 13%, Nicaragua 3%
Taiwan0.1595.5%China 63%, Vietnam 31%
Argentina2.904.6%Brazil 4%, Chile 1%
Indonesia3.783.0%Vietnam 3%

Source: Xpansiv I-REC Registry, I-REC(E) redemptions from 1 June 2025 to 30 September 2026. Countries ranked by imported volume, with Hong Kong and Macao left out: their redemptions all come from mainland China, and we have not confirmed how RE100 treats that. Shares of each country's total.

Imported I-RECs by beneficiary country, June 2025 to September 2026, million MWh
Singapore
4.69
Mexico
1.70
Malaysia
0.76
United States
0.52
Japan
0.36
Philippines
0.27
South Korea
0.26

Source: Xpansiv I-REC Registry. Singapore alone accounts for 42% of all imported volume.

Why it happens

  • Too little local supply. Singapore issues few certificates and uses far more, so companies buy from neighbours. RE100 does not accept these. See Singapore.
  • A different national certificate. In Japan, South Korea and Taiwan the certificates RE100 lists are national ones (non-fossil certificates, Korean RECs, T-RECs), and local I-REC supply is small or absent. Imported I-RECs look like an easy substitute, but they fail the market rule.
  • The wrong instrument. I-RECs redeemed for US or European sites, where US RECs and Guarantees of Origin are the instruments, do not count either, whatever their origin.
  • Neighbouring grids. Some imports cross a physical border link, for example between Central American countries. RE100's criteria say international transactions are not usually appropriate unless there is physical interconnection, and ideally mutual recognition of each other's certificates. Even then, outside the two single markets, each country is still a separate market, and CDP's 2026 technical note says its market conditions describe, almost universally, national borders. In Mexico, most imported certificates come from Guatemala. Half of recent Honduran certificates were redeemed in Guatemala, and about a third of Lao ones in Malaysia and Singapore.

How to check

  1. Look at the country of the plant on your redemption statement. It should match the country where the electricity was used.
  2. Check that the certificate is the one used in that market. See which certificate counts where.
  3. If a supplier offers certificates from another country because local supply is short or expensive, treat that as a warning: for RE100 there is no fallback.

Sources

  1. Xpansiv I-REC Registry: aggregated monthly statistics, data to September 2026 (XLSX, via I-TRACK Foundation)
  2. RE100 technical criteria and appendices (March 2025)
  3. RE100 technical FAQs (August 2025)
  4. GHG Protocol Scope 2 Guidance (2015)
  5. CDP: Accounting of Scope 2 emissions, version 12.0 (20 April 2026)