| Certificate | Korean RECs, with the Confirmation of Renewable Energy Use (CREU) issued to the buyer. RE100 lists Korean REC/CREU as in common use, and TIGR as not in common use |
| Issuer | Korea Energy Agency (KEA), which issues RECs to generators and CREUs to buyers |
| Programme | K-RE100, since 2021. No minimum consumption |
| Market boundary | South Korea. Certificates must come from Korean plants |
| Grid | 10.4% renewable in 2025, according to Ember, mostly solar and bioenergy |
Five routes, one certificate
Companies, public bodies and tenants register in KEA's K-RE100 system, use renewable electricity through one of five routes, and receive a CREU from KEA within 14 days of submitting their usage. The CREU is what you report.
| Route | Run by | How it works | Counts for Korean ETS |
|---|---|---|---|
| Green premium | KEPCO | A premium on your electricity bill, bid for in three rounds a year. Contracts end on 31 December | No |
| REC purchase | KEA | Buy RECs from generators that are not used for the RPS, over the counter or on KEA's platform | Yes |
| Third-party PPA | KEPCO | A contract with a generator, with KEPCO in between | Yes |
| Direct PPA | Korea Power Exchange | A contract with a licensed renewable electricity supplier | Yes |
| Self-consumption | KEA | Your own on-site plant | Yes |
The ETS column comes from the emissions reporting guideline and the K-RE100 rules, which both leave the green premium out of emission-reduction use. If your Korean site is covered by emissions trading, the green premium will support an RE100 claim but not a reduction in reported emissions.
The green premium
The green premium is the largest route: 33 of the 38 million MWh used through K-RE100 from 2021 to August 2025, according to ministry data reported by Kyunghyang Shinmun. Industrial, general, educational and agricultural tariff customers can bid, and tenants without their own KEPCO contract can too. The volume on offer is set from planned national renewable generation, not from specific plants or cancelled certificates. In the second 2026 round, 1.8 million MWh was awarded out of 46.7 million MWh offered.
RE100 classes the green premium as a retail contract that is not tied to specific projects. RE100's 15-year plant-age rule applies to that kind of purchase, and KEPCO does not tell buyers which plants stand behind it.
Buying RECs
Korean RECs are issued with multipliers by technology and site: a MWh from some solar plants receives more than one REC, from others less. The consumer market handles this for you. Sellers offer RECs, but buyers order in MWh, in units of 1 MWh, and the CREU is issued for the MWh actually generated. KEA cancels the RECs when it issues the CREU, and RECs bought on this market cannot be resold. Claim the MWh on the CREU, never the number of RECs.
- Green premium
- 8,156
- REC purchase
- 1,941
- Third-party PPA
- 12
- Self-generation
- 10
- Direct PPA
- 8
Source: KEEI research report 25-26 (2025), table 5-6. 2023 is the latest year with a full split by route.
By 2023, 129 companies had bought RECs this way, 59 of them small or mid-sized and 39 public or other bodies. The consumer market sets no minimum size beyond the 1 MWh order unit. The trade contract records the REC quantity, MWh and multiplier but not the plant's commissioning date, so ask the seller for it if you need to meet RE100's plant-age rule.
I-RECs in Korea
No I-RECs are issued in Korea. Some companies have had imported I-RECs redeemed for their Korean sites: since June 2025, 56% of these were issued in Vietnam, 31% in China and 12% in India. RE100 treats each country as its own market outside North America and Europe, so imported certificates do not support an RE100 claim for Korean electricity use.
Regulation to watch
- The end of the RPS. An amended renewable energy law, promulgated in September 2026 and in force from 1 January 2027, replaces the RPS with auctions for long-term fixed-price contracts with KEPCO. New plants can receive RECs only until the end of 2026, while existing generators can keep receiving them for up to 20 years. The REC spot market runs to 2029.
- A new certificate. The law creates a generation information certificate, which the government also calls a REGO (unrelated to the UK certificate), to be sold to RE100 companies on a KEA platform. Its rules are still in draft, and RE100 has not yet said how it will treat it.
- Carbon-free energy. The government's CFE initiative includes nuclear. A CFE claim is not a renewable claim under RE100.
Before you buy
- If your Korean site is covered by emissions trading, use RECs or a PPA rather than the green premium.
- For RECs, ask for the plant, technology and commissioning date. For a 2026 RE100 claim the plant must have been commissioned on or after 1 January 2011. See the 15-year rule.
- Report the MWh on your CREU, not the REC count.
- Do not use imported I-RECs for Korean consumption.