1. Check which market your sites are in
Guarantees of Origin are issued under the EU Renewable Energy Directive and move between most national registries through the AIB hub. Under RE100, a single European market lets you use a Guarantee of Origin from one country for consumption in another, but only among these countries:
Austria, Belgium, Croatia, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Italy, Latvia, Lithuania, Luxembourg, Netherlands, Norway, Portugal, Slovakia, Slovenia, Spain, Sweden and Switzerland.
Everywhere else in Europe, the certificate must come from the same country as the consumption:
- Ireland and Cyprus use Guarantees of Origin, but RE100 treats each as a separate market because their grids are not connected to the single market.
- Iceland and Serbia are also separate markets.
- Bulgaria, Poland and Romania use national Guarantees of Origin that are not issued under the AIB's EECS standard, and each is a separate market. Malta does not issue EECS certificates either.
- The United Kingdom uses REGOs. EU Guarantees of Origin are no longer accepted in Great Britain.
Contracts that started operating before 1 January 2024 may still use RE100's earlier, wider boundaries.
2. Match the timing
Under the Directive, a Guarantee of Origin covers one megawatt-hour and can be used for 12 months after the electricity was produced. It expires no later than 18 months after production. Buy certificates produced in or close to your reporting year, and have them cancelled before they expire.
3. Set your specification
Every Guarantee of Origin records the energy source, production dates, the plant and its location and capacity, the date the plant started operating, and whether it received support. Decide which of these matter to you:
- Country of production, within the market boundary above.
- Technology, if your customer prefers wind or solar, or excludes large hydro.
- Plant age, if you report to RE100: at least 85% from plants commissioned in the last 15 years.
- Support, if you want certificates from plants that received no subsidy.
As with any certificate, each extra criterion narrows the supply.
4. Find out who can cancel for you
The claim is made when the certificate is cancelled. Who may cancel depends on the country of consumption. According to AIB's 2026 member survey:
| Who may cancel | Examples | What it means for you |
|---|---|---|
| Electricity suppliers only | Germany, Austria, Italy, Ireland, Spain, Croatia | Your supplier, or a supplier working with your broker, cancels with your company named as beneficiary. |
| Any registry account holder | Netherlands, France, the Nordic and Baltic countries | A trader or broker with an account can cancel for you directly. |
Under AIB rules, a certificate is cancelled in the country where it is used, so it is transferred there first. Ask any seller how and where the cancellation will be done before you agree a price.
5. Keep the cancellation statement
The cancellation statement is your evidence. Under the EECS rules it must show:
- The account holder who cancelled.
- The beneficiary, which should be your company, and the country where the electricity was consumed.
- The period of consumption.
- The identity of each certificate cancelled.
- A unique statement number and the date.
Each certificate can appear on only one statement. See redemption statements for what auditors check.
What happens to electricity you do not cover
In the market-based method, consumption without certificates or a qualifying contract is reported with the residual mix: the grid mix after everyone else's certificates have been claimed. AIB publishes a residual mix each year. The 2025 edition, published in May 2026, covers 34 countries. In Austria, the Netherlands and Switzerland it is zero, because they operate full disclosure systems.