Guarantees of Origin cover electricity use in most of Europe. The rules on where they count, how long they last and who may cancel them differ more than most buyers expect.

Updated 15 October 2026

1. Check which market your sites are in

Guarantees of Origin are issued under the EU Renewable Energy Directive and move between most national registries through the AIB hub. Under RE100, a single European market lets you use a Guarantee of Origin from one country for consumption in another, but only among these countries:

Austria, Belgium, Croatia, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Italy, Latvia, Lithuania, Luxembourg, Netherlands, Norway, Portugal, Slovakia, Slovenia, Spain, Sweden and Switzerland.

Everywhere else in Europe, the certificate must come from the same country as the consumption:

  • Ireland and Cyprus use Guarantees of Origin, but RE100 treats each as a separate market because their grids are not connected to the single market.
  • Iceland and Serbia are also separate markets.
  • Bulgaria, Poland and Romania use national Guarantees of Origin that are not issued under the AIB's EECS standard, and each is a separate market. Malta does not issue EECS certificates either.
  • The United Kingdom uses REGOs. EU Guarantees of Origin are no longer accepted in Great Britain.

Contracts that started operating before 1 January 2024 may still use RE100's earlier, wider boundaries.

2. Match the timing

Under the Directive, a Guarantee of Origin covers one megawatt-hour and can be used for 12 months after the electricity was produced. It expires no later than 18 months after production. Buy certificates produced in or close to your reporting year, and have them cancelled before they expire.

3. Set your specification

Every Guarantee of Origin records the energy source, production dates, the plant and its location and capacity, the date the plant started operating, and whether it received support. Decide which of these matter to you:

  • Country of production, within the market boundary above.
  • Technology, if your customer prefers wind or solar, or excludes large hydro.
  • Plant age, if you report to RE100: at least 85% from plants commissioned in the last 15 years.
  • Support, if you want certificates from plants that received no subsidy.

As with any certificate, each extra criterion narrows the supply.

4. Find out who can cancel for you

The claim is made when the certificate is cancelled. Who may cancel depends on the country of consumption. According to AIB's 2026 member survey:

Who may cancelExamplesWhat it means for you
Electricity suppliers onlyGermany, Austria, Italy, Ireland, Spain, CroatiaYour supplier, or a supplier working with your broker, cancels with your company named as beneficiary.
Any registry account holderNetherlands, France, the Nordic and Baltic countriesA trader or broker with an account can cancel for you directly.

Under AIB rules, a certificate is cancelled in the country where it is used, so it is transferred there first. Ask any seller how and where the cancellation will be done before you agree a price.

5. Keep the cancellation statement

The cancellation statement is your evidence. Under the EECS rules it must show:

  • The account holder who cancelled.
  • The beneficiary, which should be your company, and the country where the electricity was consumed.
  • The period of consumption.
  • The identity of each certificate cancelled.
  • A unique statement number and the date.

Each certificate can appear on only one statement. See redemption statements for what auditors check.

What happens to electricity you do not cover

In the market-based method, consumption without certificates or a qualifying contract is reported with the residual mix: the grid mix after everyone else's certificates have been claimed. AIB publishes a residual mix each year. The 2025 edition, published in May 2026, covers 34 countries. In Austria, the Netherlands and Switzerland it is zero, because they operate full disclosure systems.

Sources

  1. Directive (EU) 2018/2001 (Renewable Energy Directive), consolidated text of 16 July 2024, Article 19
  2. AIB: members
  3. AIB: the AIB hub
  4. AIB: EECS Rules, Release 8 v1.11
  5. AIB: member survey of imposed conditions for trade, expiry and cancellation (September 2026, XLSX)
  6. AIB: European Residual Mix 2025 (May 2026)
  7. RE100 technical criteria and appendices (March 2025)