| Certificates | T-REC, and I-REC(E) on a small scale. RE100 lists both as in common use, and TIGR as not in common use |
| Issuer | National Renewable Energy Certification Center, part of the Bureau of Standards, Metrology and Inspection (BSMI) |
| T-RECs issued in 2025 | 3.7 million MWh |
| Market boundary | Taiwan. Certificates must come from Taiwanese plants |
| Grid | 12.4% renewable in 2025, according to Ember: solar 5.6%, wind 4.2%, hydro 1.9% |
How T-RECs work
One T-REC covers 1 MWh. Plants on the feed-in tariff cannot receive them, and neither can projects claiming carbon offset credits, so most of Taiwan's renewable output carries no certificate a company can buy. RE100 says its members bought only 5% of the renewable electricity generated in Taiwan, with the state utility Taipower buying most of the rest.
Three rules shape how companies buy:
- Bundled by default. When a generator or retailer supplies power over the grid, the matching certificates must go to the buyer of that power.
- Unbundled only from self-use plants. Only owners of self-use plants may sell certificates without the electricity.
- One transfer. A certificate is transferred once, as a rule, so there is no resale market. Certificates count only for the generation year printed on them.
Every buyer needs its own account on the T-REC platform, even for a private deal.
Ways to buy
| Route | What it involves |
|---|---|
| Green power from a generator or retailer | Electricity wheeled over Taipower's grid, with certificates attached. Needs a Taipower electricity account in Taiwan. The Energy Administration lists more than 90 retailers |
| Unbundled certificates from self-use plants | Bought directly or through T-REC's online auction. About 0.5 million MWh in total have been transferred this way since 2017, around 3% of all transfers |
| Your own plant | Certificates for the electricity you generate and use yourself |
Large companies take most of the green power: 78% of wheeled volume up to May 2024, according to BSMI. The government has run projects reserving solar supply for small and medium-sized companies on the T-REC platform, most recently in 2026.
Supply
- 2020
- 0.3
- 2021
- 0.7
- 2022
- 1.2
- 2023
- 1.9
- 2024
- 3.2
- 2025
- 3.7
Source: BSMI open data, T-REC issuance statistics.
- Solar
- 72.2%
- Wind
- 22.5%
- Biomass
- 3.2%
- Hydro
- 2.1%
Source: BSMI open data. Shares of 3.72 million MWh. Geothermal and other under 0.1%.
The large-user clause
Since 2021, Taipower customers with a contract capacity of 5,000 kW or more must install renewable capacity equal to 10% of their contract capacity within five years, or buy renewable electricity with certificates, or install storage. Those who do none of these pay a substitute fee. Schools, hospitals, transport and government bodies are exempt. Users who comply by buying must submit T-RECs together with proof that the electricity was delivered to them. This obligation is one of the main sources of demand for green power in Taiwan.
Reporting in Taiwan
Taiwan's carbon fee is charged on direct emissions and on emissions from electricity use, for power, gas and manufacturing companies emitting 25,000 tonnes of CO2e or more a year. The rules on self-reduction plans for these companies accept the use of T-RECs as a reduction measure; they do not mention I-RECs. We found no official residual mix for Taiwan.
I-RECs in Taiwan
I-REC issuance in Taiwan was limited to small hydro outside the feed-in tariff until January 2026, when I-TRACK opened it to solar and wind outside the feed-in tariff. The issuer checks each request against the T-REC registry so a MWh is certified once. Supply is still very small: 6,365 MWh issued from January to September 2026.
Most I-RECs redeemed for Taiwanese companies are imported: of those redeemed since June 2025, 63% were issued in China, 31% in Vietnam and 4.5% in Taiwan. RE100 treats Taiwan as its own market, so imported certificates do not support an RE100 claim for electricity used in Taiwan.
Regulation to watch
- More unbundled supply. A 2026 draft amendment to the certificate regulations would let plants without a Taipower purchase contract receive certificates for surplus power and sell them to users. It had not been adopted by October 2026.
- Solar on new buildings. From 1 August 2026, new, extended or rebuilt buildings above a set size must install solar.
- Offshore wind. Applications for round 3.3, 3.6 GW, closed on 30 September 2026. Developers in this stage mainly sign PPAs with corporate buyers.
Before you buy
- Open a T-REC account for the legal entity that will use the certificates.
- Ask for the plant, technology and commissioning date. For a 2026 RE100 claim, the plant must have been commissioned on or after 1 January 2011. See the 15-year rule.
- Use certificates for the generation year printed on them.
- If you are offered I-RECs for Taiwanese sites, check they were issued in Taiwan. See redemption statements.