REC.marketGet notified

Markets · Kenya

Kenya

Kenyan I-RECs come almost entirely from two young solar plants and a wind farm, all selling their power to Kenya Power. Supply runs well ahead of local demand. Since May 2026, large sites can buy power directly from a generator.

Updated 18 October 2026

CertificateI-REC(E). RE100 lists it as not yet in common use
IssuerThe regulator, EPRA, was approved as local issuer in December 2024. The registry still labels Kenyan issues as the central issuer's
I-RECs issued0.26 million MWh in 2025, and 0.17 million MWh from January to September 2026
I-RECs redeemed for users in Kenya, 20250.09 million MWh, almost all issued in Kenya
Grid90% renewable in 2025, according to Ember: geothermal 46%, hydro 21%, wind 16%, solar 5%. Imports were 11% of supply in 2024/25
Grid emission factor0.055 t CO2/MWh for 2024/25 (EPRA)

Supply

Evident's device register lists nine Kenyan devices. Almost all certificates so far come from two ground-mounted solar plants: Malindi Solar (52 MWp, January 2022), which Globeleq's site names with its partner AEDC, and Alten's Kesses plant near Eldoret (46.8 MWp, October 2022). The 100 MW Kipeto wind farm (2021) registered in July 2024. Six small business rooftops are registered but have issued nothing. KenGen's geothermal and hydro plants and the Lake Turkana wind farm, which produce most of Kenya's power, are not registered.

Kenyan I-REC issuance by year, million MWh
2024
0.17
2025
0.26
2026, Jan to Sep
0.17

Source: Xpansiv I-REC Registry, by date of issue. The first Kenyan issue was in May 2024.

Every device was commissioned between 2020 and 2023, so all Kenyan supply passes RE100's15-year rule until at least claim year 2035. Issuance in 2025 was about three times what Kenyan users redeemed, so volume is not a constraint.

Where Kenyan certificates go

Since June 2025, 99% of Kenyan I-RECs redeemed named a beneficiary in Kenya, and 96% of the certificates redeemed for Kenyan users were issued in Kenya. The rest, from South Africa and Uganda, do not support Kenyan claims: RE100 and CDP do not treat the East African power pool as one market. Seeimported certificates.

Who holds the attributes

Malindi, Kesses and Kipeto all sell their output to Kenya Power (KPLC) under 20-year contracts. KPLC's standard contract for renewable plants up to 10 MW says environmental attributes remain the seller's property. But a 2025 KPLC draft contract for geothermal says attributes are shared between KPLC and the seller. The three large plants' contracts were negotiated individually and are not public, so ask the seller for the attribute clause in writing.

Carbon credits

Kipeto is a registered CDM project, but its crediting period ended in July 2021 with no issuance requested, before its I-REC registration began. We found none of the three large plants in the Gold Standard registry. KenGen's Olkaria geothermal plants do earn carbon credits, but they issue no I-RECs. Kenya's carbon market regulations of 2024 cover carbon credits only, not electricity certificates. Ask for a written statement that the MWh carry no carbon credits.

Buying electricity directly

Kenya Power has long been the single buyer and retailer. The open-access regulations in force since 8 May 2026 let an eligible consumer buy in bulk from a generator if its load is at least 1 MVA on the distribution grid or 10 MVA on the transmission grid. EPRA must approve both the supply contract and the wheeling agreement, and wheeling charges have not yet been published. A company using a few thousand MWh a year is near or below the threshold, so unbundled I-RECs plus on-site solar remain the usual route.

The 2024 net metering regulations cover systems under 1 MW, with a 100 MW national cap for the first five years. They give any carbon credits from a net-metered system to the consumer.

Emission factors

EPRA's annual statistics report gives a grid emission factor of 0.055 t CO2/MWh for 2024/25, up from 0.048 a year earlier as thermal generation rose. It divides thermal plant emissions by total generation and appears to count imports at zero. Another EPRA report calls 0.5 t CO2/MWh the national grid factor, so agree the factor with your auditor. We found no residual mix. Imports, mainly from Ethiopia, carry no certificates.

Before you buy

  • Ask for the device and written confirmation that its contract with Kenya Power leaves the environmental attributes with the seller.
  • Ask for confirmation that the MWh carry no CDM, Verra or Gold Standard credits.
  • Make sure the redemption names your Kenyan legal entity and gives Kenya as the location of consumption. See redemption statements.
I-RECs issued and redeemed per quarter, to Q3 2026
  • Issued from plants here
  • Redeemed for users here
00.10.220222023202420252026Issued from plants here, Q1 2021: 0.00 million MWhIssued from plants here, Q2 2021: 0.00 million MWhIssued from plants here, Q3 2021: 0.00 million MWhIssued from plants here, Q4 2021: 0.00 million MWhIssued from plants here, Q1 2022: 0.00 million MWhIssued from plants here, Q2 2022: 0.00 million MWhIssued from plants here, Q3 2022: 0.00 million MWhIssued from plants here, Q4 2022: 0.00 million MWhIssued from plants here, Q1 2023: 0.00 million MWhIssued from plants here, Q2 2023: 0.00 million MWhIssued from plants here, Q3 2023: 0.00 million MWhIssued from plants here, Q4 2023: 0.00 million MWhIssued from plants here, Q1 2024: 0.00 million MWhIssued from plants here, Q2 2024: 0.12 million MWhIssued from plants here, Q3 2024: 0.00 million MWhIssued from plants here, Q4 2024: 0.05 million MWhIssued from plants here, Q1 2025: 0.12 million MWhIssued from plants here, Q2 2025: 0.05 million MWhIssued from plants here, Q3 2025: 0.00 million MWhIssued from plants here, Q4 2025: 0.09 million MWhIssued from plants here, Q1 2026: 0.03 million MWhIssued from plants here, Q2 2026: 0.07 million MWhIssued from plants here, Q3 2026: 0.08 million MWhRedeemed for users here, Q1 2021: 0.00 million MWhRedeemed for users here, Q2 2021: 0.02 million MWhRedeemed for users here, Q3 2021: 0.00 million MWhRedeemed for users here, Q4 2021: 0.04 million MWhRedeemed for users here, Q1 2022: 0.00 million MWhRedeemed for users here, Q2 2022: 0.01 million MWhRedeemed for users here, Q3 2022: 0.00 million MWhRedeemed for users here, Q4 2022: 0.00 million MWhRedeemed for users here, Q1 2023: 0.00 million MWhRedeemed for users here, Q2 2023: 0.01 million MWhRedeemed for users here, Q3 2023: 0.00 million MWhRedeemed for users here, Q4 2023: 0.05 million MWhRedeemed for users here, Q1 2024: 0.01 million MWhRedeemed for users here, Q2 2024: 0.10 million MWhRedeemed for users here, Q3 2024: 0.00 million MWhRedeemed for users here, Q4 2024: 0.01 million MWhRedeemed for users here, Q1 2025: 0.01 million MWhRedeemed for users here, Q2 2025: 0.06 million MWhRedeemed for users here, Q3 2025: 0.01 million MWhRedeemed for users here, Q4 2025: 0.01 million MWhRedeemed for users here, Q1 2026: 0.01 million MWhRedeemed for users here, Q2 2026: 0.07 million MWhRedeemed for users here, Q3 2026: 0.00 million MWh

million MWh

Source: Xpansiv I-REC Registry, I-REC(E) only, our quarterly totals. Issued counts plants in this country; redeemed counts certificates claimed for users here, wherever the plant is.

Show data
PeriodIssued from plants hereRedeemed for users here
Q1 20210.000.00
Q2 20210.000.02
Q3 20210.000.00
Q4 20210.000.04
Q1 20220.000.00
Q2 20220.000.01
Q3 20220.000.00
Q4 20220.000.00
Q1 20230.000.00
Q2 20230.000.01
Q3 20230.000.00
Q4 20230.000.05
Q1 20240.000.01
Q2 20240.120.10
Q3 20240.000.00
Q4 20240.050.01
Q1 20250.120.01
Q2 20250.050.06
Q3 20250.000.01
Q4 20250.090.01
Q1 20260.030.01
Q2 20260.070.07
Q3 20260.080.00

Download quarterly volumes for all 43 countries (CSV)

Sources

  1. Xpansiv I-REC Registry: aggregated monthly statistics, data to September 2026 (XLSX, via I-TRACK Foundation)
  2. Evident: I-REC device register (Kenya)
  3. I-TRACK Foundation: Kenya country page
  4. I-TRACK Foundation: Country Assessment Report, Kenya
  5. EPRA: Energy and Petroleum Statistics Report, financial year 2024/25 (September 2025)
  6. Energy (Electricity Market, Bulk Supply and Open Access) Regulations 2026, LN 79/2026 (Kenya Law)
  7. Energy (Net Metering) Regulations 2024, LN 104/2024 (EPRA)
  8. Kenya Power: standardized PPA for small-scale renewable generators under 10 MW (via World Bank PPP)
  9. Kenya Power: draft geothermal PPA (public procurement portal, 2025)
  10. Globeleq: Malindi Solar
  11. Alten Energy: Alten Kenya commissions Kesses solar facility (June 2023)
  12. UNFCCC CDM: Kipeto Wind Energy Project (8775)
  13. Climate Change (Carbon Markets) Regulations 2024
  14. RE100 technical criteria and appendices (March 2025)
  15. Ember: yearly electricity data (full release, CSV)