Ecuadorian I-RECs come from a handful of private run-of-river hydro plants. The state's large hydro plants are not registered, so supply is small and roughly equal to local demand. Only large sites can buy power directly from a generator.

Updated 18 October 2026

CertificateI-REC(E). RE100 lists it as not yet in common use
IssuerAENOR Ecuador, the local issuer approved in March 2025. Earlier certificates were issued by the central issuer
I-RECs issued0.18 million MWh in 2025, and 0.22 million MWh from January to September 2026, almost all hydro
I-RECs redeemed for users in Ecuador, 20250.20 million MWh, almost all issued in Ecuador
Grid79% renewable in 2025, according to Ember: hydro 78%. Fossil fuels make up 21%
Market boundaryEcuador. Certificates must come from Ecuadorian plants

Supply

Evident's public device register names four Ecuadorian devices: the Hidronormandia run-of-river plant in Morona Santiago (49.6 MW, 2018), the Due plant in Sucumbíos (64.3 MW, 2020), a 0.9 MW rooftop on the Riocentro El Dorado shopping centre (2022) and the Chanduy solar plant (2 MW, 2025). The registry data also count a fifth device, a 53 MW hydro plant commissioned in January 2006, which the public search does not show. All registered plants are private. No plant of the state generator CELEC is registered, including the 1,500 MW Coca Codo Sinclair.

Ecuadorian I-REC issuance by year, million MWh
2023
0.05
2024
0.24
2025
0.18
2026, Jan to Sep
0.22

Source: Xpansiv I-REC Registry, by date of issue. 2026 covers nine months only.

Supply is tight: Ecuadorian users redeemed 0.20 million MWh in 2025, more than the 0.18 million issued that year. Since June 2025 every Ecuadorian I-REC redeemed named a beneficiary in Ecuador, and 97% of the certificates redeemed for Ecuadorian users were issued in Ecuador. The rest came from Colombia and do not support Ecuadorian claims. Seeimported certificates.

Plant age

Of 2026 issuance, 63% came from plants commissioned between 2015 and 2019 and 33% from plants commissioned between 2005 and 2014. The 2006 plant fails RE100's 15-year rule. Hidronormandia qualifies up to claim year 2033 and Due up to 2035, so ask which plant you are buying from.

Buying electricity directly

Only a qualified large consumer, a "Gran Consumidor", can buy power from a generator. Under the regulator's 2021 rules, each supply point needs at least 1,000 kW of monthly peak demand, at least 7,000 MWh a year and a load factor of at least 0.50, and sites cannot be added together. A Gran Consumidor must contract all its demand bilaterally with private generators or self-generators, and pays transmission and distribution tolls. Most companies using a few thousand MWh a year fall below this.

The January 2024 energy competitiveness law lets any consumer install renewable generation for its own supply, owned by itself or by a third party. An October 2024 law and a 2025 regulation opened larger private renewable projects selling to distributors. None of these texts mentions certificates or environmental attributes. Ecuador has no utility green tariff.

Carbon credits and emission factors

The Abanico hydro plant (2006) was a CDM project until February 2020, and its crediting can no longer be renewed. If it is the 2006 device, its I-REC registration starts in 2022, so issued volumes should not overlap. We found no CDM project for Hidronormandia or Due. Ask for a written statement that the MWh carry no carbon credits.

The grid operator CENACE calculates an official CO2 factor for the national grid each year, including one intended for corporate inventories and carbon footprints, which a technical commission of the energy and environment ministries approves. The 2024 factor rose sharply because the drought cut hydro output. There is no residual mix.

The 2024 drought

A drought in 2024 cut hydro output and led to scheduled power cuts of up to 14 hours a day from late October, which ended on 20 December 2024. Run-of-river plants like Ecuador's I-REC devices depend on river flow, so issuance can fall in dry years.

Before you buy

  • Ask for the device and its commissioning date. For RE100, choose Hidronormandia, Due or the solar devices.
  • Supply is close to demand, so ask about volume and vintage before you commit.
  • Ask for confirmation that the MWh carry no CDM, Verra or Gold Standard credits.
  • Make sure the redemption names your Ecuadorian legal entity and gives Ecuador as the location of consumption. See redemption statements.
I-RECs issued and redeemed per quarter, to Q3 2026
  • Issued from plants here
  • Redeemed for users here
00.10.2202220242026Issued from plants here, Q2 2020: 0.00 million MWhIssued from plants here, Q3 2020: 0.00 million MWhIssued from plants here, Q4 2020: 0.00 million MWhIssued from plants here, Q1 2021: 0.00 million MWhIssued from plants here, Q2 2021: 0.00 million MWhIssued from plants here, Q3 2021: 0.00 million MWhIssued from plants here, Q4 2021: 0.00 million MWhIssued from plants here, Q1 2022: 0.00 million MWhIssued from plants here, Q2 2022: 0.00 million MWhIssued from plants here, Q3 2022: 0.00 million MWhIssued from plants here, Q4 2022: 0.00 million MWhIssued from plants here, Q1 2023: 0.00 million MWhIssued from plants here, Q2 2023: 0.00 million MWhIssued from plants here, Q3 2023: 0.00 million MWhIssued from plants here, Q4 2023: 0.05 million MWhIssued from plants here, Q1 2024: 0.05 million MWhIssued from plants here, Q2 2024: 0.06 million MWhIssued from plants here, Q3 2024: 0.09 million MWhIssued from plants here, Q4 2024: 0.04 million MWhIssued from plants here, Q1 2025: 0.03 million MWhIssued from plants here, Q2 2025: 0.03 million MWhIssued from plants here, Q3 2025: 0.13 million MWhIssued from plants here, Q4 2025: 0.00 million MWhIssued from plants here, Q1 2026: 0.14 million MWhIssued from plants here, Q2 2026: 0.00 million MWhIssued from plants here, Q3 2026: 0.08 million MWhRedeemed for users here, Q2 2020: 0.01 million MWhRedeemed for users here, Q3 2020: 0.00 million MWhRedeemed for users here, Q4 2020: 0.01 million MWhRedeemed for users here, Q1 2021: 0.01 million MWhRedeemed for users here, Q2 2021: 0.03 million MWhRedeemed for users here, Q3 2021: 0.00 million MWhRedeemed for users here, Q4 2021: 0.02 million MWhRedeemed for users here, Q1 2022: 0.01 million MWhRedeemed for users here, Q2 2022: 0.01 million MWhRedeemed for users here, Q3 2022: 0.00 million MWhRedeemed for users here, Q4 2022: 0.05 million MWhRedeemed for users here, Q1 2023: 0.01 million MWhRedeemed for users here, Q2 2023: 0.03 million MWhRedeemed for users here, Q3 2023: 0.00 million MWhRedeemed for users here, Q4 2023: 0.05 million MWhRedeemed for users here, Q1 2024: 0.04 million MWhRedeemed for users here, Q2 2024: 0.04 million MWhRedeemed for users here, Q3 2024: 0.05 million MWhRedeemed for users here, Q4 2024: 0.03 million MWhRedeemed for users here, Q1 2025: 0.06 million MWhRedeemed for users here, Q2 2025: 0.04 million MWhRedeemed for users here, Q3 2025: 0.03 million MWhRedeemed for users here, Q4 2025: 0.07 million MWhRedeemed for users here, Q1 2026: 0.09 million MWhRedeemed for users here, Q2 2026: 0.05 million MWhRedeemed for users here, Q3 2026: 0.04 million MWh

million MWh

Source: Xpansiv I-REC Registry, I-REC(E) only, our quarterly totals. Issued counts plants in this country; redeemed counts certificates claimed for users here, wherever the plant is.

Show data
PeriodIssued from plants hereRedeemed for users here
Q2 20200.000.01
Q3 20200.000.00
Q4 20200.000.01
Q1 20210.000.01
Q2 20210.000.03
Q3 20210.000.00
Q4 20210.000.02
Q1 20220.000.01
Q2 20220.000.01
Q3 20220.000.00
Q4 20220.000.05
Q1 20230.000.01
Q2 20230.000.03
Q3 20230.000.00
Q4 20230.050.05
Q1 20240.050.04
Q2 20240.060.04
Q3 20240.090.05
Q4 20240.040.03
Q1 20250.030.06
Q2 20250.030.04
Q3 20250.130.03
Q4 20250.000.07
Q1 20260.140.09
Q2 20260.000.05
Q3 20260.080.04

Download quarterly volumes for all 43 countries (CSV)

Sources

  1. Xpansiv I-REC Registry: aggregated monthly statistics, data to September 2026 (XLSX, via I-TRACK Foundation)
  2. Evident: I-REC device register (Ecuador)
  3. I-TRACK Foundation: Ecuador country page
  4. I-TRACK Foundation: AENOR Ecuador approved as local issuer (March 2025)
  5. I-TRACK Foundation: Country Assessment Report, Ecuador (January 2022)
  6. ARCERNNR: Regulación ARCERNNR-003/21, grandes consumidores (2021)
  7. Ley Orgánica de Competitividad Energética, Registro Oficial 475 (January 2024, FAOLEX)
  8. ARCONEL: regulation on non-conventional renewable projects (2025)
  9. UNFCCC CDM: Abanico Hydroelectric Project (0141)
  10. BIO: Hidronormandia
  11. ARCONEL / CENACE: Factor de emisión de CO2 del Sistema Nacional Interconectado, informe 2024 (2025)
  12. Teleamazonas: power cuts end on 20 December 2024
  13. RE100 technical criteria and appendices (March 2025)
  14. Ember: yearly electricity data (full release, CSV)