| Certificate | I-REC(E), in common use according to RE100 |
| Issuer | The Green Certificate Company, the central issuer. First issue May 2020 |
| I-RECs issued in 2025 | 0.33 million MWh, and 0.26 million MWh from January to September 2026 |
| Grid | Almost entirely renewable in 2025, according to Ember: hydro 75%, wind 12%, geothermal 12% |
| Grid emission factor | 0.0415 kg CO2e/kWh for 2025, but 0.127 for the dry year 2024 (IMN) |
| Market boundary | Costa Rica. Certificates must come from Costa Rican plants |
Why a renewable grid is not enough
RE100 lets companies count grid power as renewable only where the grid is over 95% renewable and there is no way to buy renewable electricity specifically. It has found only Paraguay, Uruguay and Ethiopia meet that test. Its FAQ addresses Costa Rica by name: because an I-REC registry exists, a claim based on the grid mix is "double-claiming" renewable electricity that other companies have bought.
CDP says the same in general terms: grid-mix renewables should not be reported as renewable procurement where certificates exist. Under the GHG Protocol, a company without certificates uses a residual mix in its market-based total or, where none exists, the grid average, and says so. We found no residual mix for Costa Rica, so in practice that means the official factor below, with no renewable MWh claimed.
Supply
The registry lists 13 active Costa Rican devices with 143 MW: two wind farms of about 50 MW each, three hydro plants totalling 43 MW and a few small solar systems. Seven registrants are based in Costa Rica.
- 2021
- 0.09
- 2022
- 0.18
- 2023
- 0.18
- 2024
- 0.23
- 2025
- 0.33
- 2026, Jan to Sep
- 0.26
Source: Xpansiv I-REC Registry, by date of issue. 2026 covers nine months only.
There is no state certificate scheme, and the issuer's 2025 country report says none is planned. Since April 2026 a Costa Rican firm, CEPAM, has resold I-RECs that the cooperative distributors' consortium, CONELECTRICAS, buys from its members. ICE's "Sello de Electricidad Renovable" is a recognition based on the grid mix, not a certificate, so it does not support RE100 or market-based claims.
Plant age
In 2026, 60% of issuance came from hydro commissioned between 2005 and 2014, and the registry shows this is almost all a 24 MW plant commissioned in November 2009. RE100's 15-year rule needs plants commissioned in 2011 or later for 2026 claims, so that plant counts only within the 15% allowance. The rest came from a wind farm commissioned in 2015, which qualifies until claim year 2030. A 17 MW hydro plant from 1997 joined the registry in January 2026 and is also too old.
Where Costa Rican certificates go
Since June 2025, 39% of Costa Rican I-RECs redeemed named a beneficiary in Nicaragua, and 5% one in Mexico. Seen from Nicaragua, 69% of all certificates redeemed there were Costa Rican. The two grids are linked through the Central American regional market, but RE100 and CDP treat each country as its own market, so these certificates do not support claims in Nicaragua. See imported certificates.
Buying electricity
Electricity supply is a regulated public service, and each distributor (ICE, CNFL, JASEC, ESPH and the cooperatives) serves its own concession area. Private plants sell to ICE under Ley 7200, up to 20 MW each in the first regime and in blocks of up to 50 MW in the second. No law we read lets a company contract grid power from a generator. Companies can generate for their own use on site under Ley 10086. So certificates in Costa Rica are bought separately from the power. The laws do not say who holds the attributes of power sold to ICE, so ask the seller.
A bill to open a wholesale market to large consumers (file 23.414) passed its first vote on 26 May 2026. Its final vote was still pending in mid-October 2026.
The national factor and carbon neutrality
The national weather institute, IMN, publishes the factor that national inventories use: 0.0415 kg CO2e/kWh for 2025, 0.127 for 2024, 0.0879 for 2023 and 0.0534 for 2022. It swings with rainfall, because dry years need thermal plants. It is a location-based average, not a residual mix.
The national carbon-neutrality programme, PPCN 2.0, tells participants to use the IMN factor and does not mention certificates. A PPCN inventory and a CDP or RE100 market-based inventory may therefore differ. Ask the environment ministry's climate office before counting I-RECs towards PPCN recognition.
Before you buy
- Ask for the plant and its commissioning date. For RE100, choose plants commissioned in 2011 or later, or 2012 or later for 2027 claims.
- Make sure the redemption names your Costa Rican legal entity and gives Costa Rica as the location of consumption. See redemption statements.
- Ask whether the plant sells its power to ICE or a distributor, and whether it also issues carbon credits for the same output.
- For sites in Nicaragua, buy certificates issued in Nicaragua.