Sri Lankan I-RECs come mostly from factory rooftops and small hydro and wind plants, and almost all are used at home, largely by exporters supplying global brands. There is no national scheme, no way yet to buy renewable power over the grid, and a real risk of double claims with carbon credits.

Updated 18 October 2026

CertificateI-REC(E). RE100 lists it as not yet in common use
IssuerThe Green Certificate Company, the central issuer. First issue February 2021
I-RECs issued in 20250.32 million MWh, and 0.15 million MWh from January to September 2026
I-RECs redeemed for users in Sri Lanka, 20250.23 million MWh, almost all issued in Sri Lanka
Grid63% renewable in 2025, according to Ember: hydro 38%, solar 18%, wind 5%. Coal makes up 27%
Grid emission factor0.4242 kg CO2/kWh average for 2023 (SLSEA)

Supply

The registry lists 116 active Sri Lankan devices with 190 MW: 93 solar, 19 hydro and 4 wind. Most are small: 88 are 1.05 MW or less, which suggests factory rooftops, and none is larger than 15 MW. The state's large hydro and coal plants are not registered. Seven registrants are based in Sri Lanka. The first Sri Lankan I-RECs, in March 2021, went to the apparel maker Hirdaramani for rooftop solar at its own factories.

Sri Lankan I-REC issuance by year, million MWh
2021
0.02
2022
0.10
2023
0.14
2024
0.27
2025
0.32
2026, Jan to Sep
0.15

Source: Xpansiv I-REC Registry, by date of issue. 2026 covers nine months only.

Supply is young: 58% of 2026 issuance came from plants commissioned between 2020 and 2024, and only about 3% from plants older than 2005, so RE100's 15-year rule rarely bites. Since June 2025, 97% of Sri Lankan I-RECs redeemed named a beneficiary in Sri Lanka. There is no national certificate scheme, and no law mandates or restricts I-RECs.

Rooftop solar and who holds the attributes

Sri Lanka has more than 800 MW of grid-connected rooftop solar under three main schemes. Under net metering and net accounting, the owner uses its own output and is credited or paid for exports. Under net plus, all output is sold to the utility through a separate meter, and the owner buys its power from the grid as usual. The regulator's guidelines and the utility's agreement template we read say nothing about environmental attributes.

Since 11 September 2026 new connections are net plus only, according to press reports of an energy ministry directive. For a factory that sells all its rooftop output to the utility, ask how the seller supports an I-REC claim on that output, since the contract is silent rather than explicit.

Carbon credits

Rooftop solar and small hydro are also the main technologies in Sri Lanka's national carbon-crediting scheme, run by the state-owned Sri Lanka Climate Fund, which credits factory rooftops such as Noritake's and Forbes & Walker's. Gold Standard lists Sri Lankan wind, mini-hydro and solar projects too. The scheme documents we read say the projects have not sought renewable energy certificates. Ask the seller to confirm in writing that the same MWh carry no carbon credits.

Buying electricity

The Electricity Act No. 36 of 2024 broke up the state utility, CEB, and the successor companies took over on 9 March 2026. The new National System Operator is the single buyer: all CEB purchase agreements pass to it, and generators must sell to it until they expire. The Act provides for open access, which would let eligible consumers buy from generators, but only from a date the minister sets by Gazette order. In September 2026 the regulator, PUCSL, was still tendering for consultants to design the framework. Rooftop agreements give no right to wheel power to others. For now, companies buy I-RECs separately from their power, or generate their own.

Emission factors

The Sri Lanka Sustainable Energy Authority publishes an average emission factor for electricity users' carbon footprints: 0.4242 kg CO2/kWh for 2023, down from 0.5309 in 2020. It also publishes a combined margin of 0.6616 for 2023, but that is for carbon-offset projects, not Scope 2. There is no residual mix.

Before you buy

  • Ask for the device, its connection scheme and whether its output is sold to the utility.
  • Ask for a written statement that the MWh carry no Gold Standard, CDM or national scheme carbon credits.
  • Make sure the redemption names your Sri Lankan legal entity and gives Sri Lanka as the location of consumption. See redemption statements.
I-RECs issued and redeemed per quarter, to Q3 2026
  • Issued from plants here
  • Redeemed for users here
00.10.2202220242026Issued from plants here, Q1 2020: 0.00 million MWhIssued from plants here, Q2 2020: 0.00 million MWhIssued from plants here, Q3 2020: 0.00 million MWhIssued from plants here, Q4 2020: 0.00 million MWhIssued from plants here, Q1 2021: 0.01 million MWhIssued from plants here, Q2 2021: 0.00 million MWhIssued from plants here, Q3 2021: 0.00 million MWhIssued from plants here, Q4 2021: 0.01 million MWhIssued from plants here, Q1 2022: 0.03 million MWhIssued from plants here, Q2 2022: 0.01 million MWhIssued from plants here, Q3 2022: 0.04 million MWhIssued from plants here, Q4 2022: 0.02 million MWhIssued from plants here, Q1 2023: 0.05 million MWhIssued from plants here, Q2 2023: 0.02 million MWhIssued from plants here, Q3 2023: 0.01 million MWhIssued from plants here, Q4 2023: 0.07 million MWhIssued from plants here, Q1 2024: 0.03 million MWhIssued from plants here, Q2 2024: 0.06 million MWhIssued from plants here, Q3 2024: 0.06 million MWhIssued from plants here, Q4 2024: 0.12 million MWhIssued from plants here, Q1 2025: 0.06 million MWhIssued from plants here, Q2 2025: 0.04 million MWhIssued from plants here, Q3 2025: 0.10 million MWhIssued from plants here, Q4 2025: 0.12 million MWhIssued from plants here, Q1 2026: 0.08 million MWhIssued from plants here, Q2 2026: 0.05 million MWhIssued from plants here, Q3 2026: 0.02 million MWhRedeemed for users here, Q1 2020: 0.01 million MWhRedeemed for users here, Q2 2020: 0.00 million MWhRedeemed for users here, Q3 2020: 0.00 million MWhRedeemed for users here, Q4 2020: 0.00 million MWhRedeemed for users here, Q1 2021: 0.01 million MWhRedeemed for users here, Q2 2021: 0.01 million MWhRedeemed for users here, Q3 2021: 0.00 million MWhRedeemed for users here, Q4 2021: 0.01 million MWhRedeemed for users here, Q1 2022: 0.01 million MWhRedeemed for users here, Q2 2022: 0.00 million MWhRedeemed for users here, Q3 2022: 0.02 million MWhRedeemed for users here, Q4 2022: 0.01 million MWhRedeemed for users here, Q1 2023: 0.05 million MWhRedeemed for users here, Q2 2023: 0.02 million MWhRedeemed for users here, Q3 2023: 0.01 million MWhRedeemed for users here, Q4 2023: 0.05 million MWhRedeemed for users here, Q1 2024: 0.08 million MWhRedeemed for users here, Q2 2024: 0.04 million MWhRedeemed for users here, Q3 2024: 0.03 million MWhRedeemed for users here, Q4 2024: 0.02 million MWhRedeemed for users here, Q1 2025: 0.13 million MWhRedeemed for users here, Q2 2025: 0.02 million MWhRedeemed for users here, Q3 2025: 0.01 million MWhRedeemed for users here, Q4 2025: 0.06 million MWhRedeemed for users here, Q1 2026: 0.11 million MWhRedeemed for users here, Q2 2026: 0.03 million MWhRedeemed for users here, Q3 2026: 0.02 million MWh

million MWh

Source: Xpansiv I-REC Registry, I-REC(E) only, our quarterly totals. Issued counts plants in this country; redeemed counts certificates claimed for users here, wherever the plant is.

Show data
PeriodIssued from plants hereRedeemed for users here
Q1 20200.000.01
Q2 20200.000.00
Q3 20200.000.00
Q4 20200.000.00
Q1 20210.010.01
Q2 20210.000.01
Q3 20210.000.00
Q4 20210.010.01
Q1 20220.030.01
Q2 20220.010.00
Q3 20220.040.02
Q4 20220.020.01
Q1 20230.050.05
Q2 20230.020.02
Q3 20230.010.01
Q4 20230.070.05
Q1 20240.030.08
Q2 20240.060.04
Q3 20240.060.03
Q4 20240.120.02
Q1 20250.060.13
Q2 20250.040.02
Q3 20250.100.01
Q4 20250.120.06
Q1 20260.080.11
Q2 20260.050.03
Q3 20260.020.02

Download quarterly volumes for all 43 countries (CSV)

Sources

  1. Xpansiv I-REC Registry: aggregated monthly statistics, data to September 2026 (XLSX, via I-TRACK Foundation)
  2. I-TRACK Foundation: Sri Lanka country page
  3. I-TRACK Foundation: Country Assessment Report, Sri Lanka (February 2026)
  4. I-TRACK Foundation: Hirdaramani Group receives first issuance of I-RECs in Sri Lanka (March 2021)
  5. Sri Lanka Electricity Act No. 36 of 2024 (Parliament of Sri Lanka)
  6. Ada Derana: CEB successor companies take effect (9 March 2026)
  7. PUCSL: consultancy to formulate an open-access regulatory framework (2026)
  8. PUCSL: Guidelines on rooftop solar PV installation for utility providers (May 2022)
  9. PUCSL: Rooftop solar PV connection schemes (October 2023)
  10. The Morning: net metering and net accounting scrapped for new rooftop connections (20 September 2026)
  11. Sri Lanka Climate Fund: Sri Lanka Carbon Crediting Scheme projects
  12. SLSEA: Sri Lanka Energy Balance 2023
  13. RE100 technical criteria and appendices (March 2025)
  14. Ember: yearly electricity data (full release, CSV)