| Certificate | GEC, the national Green Electricity Certificate |
| Issued by | The National Energy Administration (NEA) |
| RE100 | Recognised as credible since 2025, with no China-specific conditions |
| GECs issued in 2025 | 2.95 billion, of which 1.89 billion tradable; 930 million traded |
| Buyers in 2025 | About 107,900 companies |
| Market boundary | China. Certificates must come from Chinese plants |
| Grid | Coal 54% in 2025, wind and solar 22%, according to Ember |
From I-REC to GEC
I-RECs were widely used in China until 2024. I-TRACK stopped registering new Chinese plants on 13 September 2024. Registered plants could request issuance until 31 March 2025, only for electricity generated up to the end of 2024. RE100 still accepts Chinese I-RECs for generation before 2025, but for current consumption the GEC is the instrument.
- 2021
- 19.8
- 2022
- 30.9
- 2023
- 47.2
- 2024
- 53.3
- 2025
- 27.7
- 2026, Jan to Sep
- 3.6
Source: Xpansiv I-REC Registry. Redemptions in 2025 and 2026 use certificates for generation up to 2024.
RE100 announced in 2025 that it considers GECs credible, after the NEA addressed two concerns: double counting with China's carbon offset scheme (CCER), and certificates that never expired. RE100 says the extra steps it recommended in 2020 are no longer needed. Its normal rules still apply, including the 15-year plant-age rule and certificate cancellation from the 2027 CDP cycle.
The rules that matter to buyers
Under the NEA's implementing rules of November 2025:
- Matching years. From 1 January 2026, the GEC's generation year must match the year of consumption it is claimed against.
- Two-year validity. A GEC expires at the end of the 24th month after the month of generation.
- One trade only. A GEC can be traded once, so buy from the first seller or an agent acting for you.
- Province. The buyer chooses the province the claim belongs to when it buys.
- Overseas accounts are open only to users that exchange electricity with China.
Ways to buy
| Route | How it works |
|---|---|
| Unbundled GECs | Bought on their own on an official trading platform, for consumption you choose. |
| Green power trading | Electricity bought with GECs attached, with the energy and certificate prices stated separately. These GECs cannot be resold. Most companies buy through a retail supplier rather than directly from a generator. |
Virtual PPAs are not available in China, and the default grid supply cannot be claimed as renewable.
The evidence
The proof is a chain of documents: the certificate, a transaction voucher showing you as buyer, and, after cancellation, a sealed cancellation sheet with the holder's name, quantity, use, consumption period and location. None of them shows the plant's commissioning date, so if you report to RE100, write the 15-year limit into your contract and ask your seller for the plant details.
Mandatory use for heavy industry
China is setting renewable electricity consumption targets for energy-intensive sectors, measured mainly through GECs. Steel, non-ferrous metals, building materials, petrochemicals, chemicals and data centres must reach the national average by 2030, and new data centres in national hub regions must exceed 80%. In 2025 only electrolytic aluminium was assessed; the other sectors were monitored.
Before you buy
- Match the GEC generation year to your consumption year.
- Ask for the plant, technology and commissioning date.
- Make sure the cancellation sheet names your Chinese legal entity, the consumption period and the location.